Client: Deutsche Bahn
Collaboration with: Product designer Sebastian Fengler and Team Smart City | DB – Nora Stenhöfel, Franziska Sack, Anna Heinemann
Place: Vaihingen train station
Year: 2021
Materials: Concrete, steel
Structural engineer: Buro Happold, Philipp Christ
Manufacturer: Freiraumgestaltung Fischer, Gerlach Metallbau, Stilbeton
![](http://annahougaard.com/wp-content/uploads/2023/09/mob-hub-1-721x1024.jpg)
The Mobility Hub in Vaihingen is a pilot project incorporating shared means of sustainable transportation at DB train stations.
![](http://annahougaard.com/wp-content/uploads/2023/09/from-DB-Homepage-1024x729.jpg)
![](http://annahougaard.com/wp-content/uploads/2023/09/mob-hub-2-1024x768.jpg)
![](http://annahougaard.com/wp-content/uploads/2023/09/rend-vaihingen-1024x490.jpg)
![](http://annahougaard.com/wp-content/uploads/2023/09/mob-hub-4-1024x781.jpg)
![](http://annahougaard.com/wp-content/uploads/2023/09/mob-hub-3-758x1024.jpg)